.
.
.
.
.
.

UVA University Hall

Design build services, hazardous material abatement and demolition of 4 athletic venue structures and connecting abridgement infrastructure along with site demolition and subsequent preparation to follow the long-term redevelopment plans of the university. Due to safety concerns to nearby infrastructure, implosion of the largest structure (University Hall basketball arena) was selected as the preferred method of removal.

  • Completed on:5/2019
  • Location:Charlottesville, VA
  • Video: Watch Video
Ready to partner with Renascent? Contact us!