University of Tennessee Humes Hall

Demolition of 8-story post-tension building on an active UT Knoxville Campus. Surrounding buildings remained open during the project.

  • Location: Knoxville, TN
  • Completed: 8/2017
  • Watch Video
University of Tennessee Humes Hall

University of Southern Indiana Arena Renovation

Demolition of the natatorium at the University of Southern Indiana Physical Activities Center. Crane had to be used to pick precast double-T roof beams to ensure the existing wall to remain was protected.

  • Location: Evansville, IN
  • Completed: 5/2017
University of Southern Indiana Arena Renovation

Ball State University Lafollette Complex

Demolition of three 8-story dormitory wings at Ball State University. Building remained occupied throughout the demolition, crushing and backfill operations.

Ball State University Lafollette Complex

Nashville Davidson Criminal Justice Center

Demolition of the maximum-security prison complex in downtown Nashville, TN. Active government buildings around the site stayed open at all times.

  • Location: Nashville, TN
  • Completed: 3/2017
  • Watch Video
Nashville Davidson Criminal Justice Center

Community Hospital East

Demolition of the center third of an active hospital while protecting both the basement that supports the power and communications of the hospital and all of the surrounding building. Demolition of the center third of an active hospital while protecting both the basement that supports the power and communications of the hospital and all of the surrounding building.

  • Location: Indianapolis, IN
  • Completed: 4/2017
  • Watch Video
Community Hospital East

Barnes & Thornburg

Removal of a 180‑ft steam stack off the Barnes & Thornburg building in downtown Indianapolis. Stack was removed in 6‑foot sections over active buildings.

  • Location: Indianapolis, IN
  • Completed: 2/2016
Barnes & Thornburg

Indiana State Fairgrounds—Pepsi Coliseum

Selective Structural Demolition of the interior of the Pepsi Coliseum at the Indiana State Fairgrounds. Extensive planning to maintain the structural integrity of the building went into this project.

  • Location: Indianapolis, IN
  • Completed: 2012
Indiana State Fairgrounds—Pepsi Coliseum

Indiana State University—Statesman Towers Demolition

Demolition of two 15-story, 180-ft-tall towers at Indiana State University. After demolition, concrete from the buildings was crushed to fill in the basement.

Indiana State University—Statesman Towers Demolition

University of Kentucky—Scott Street Demolition

Demolition of multiple buildings at the University of KY including a two story warehouse. Site grading and paving were done upon completion to turn the site into a parking lot for the campus.

University of Kentucky—Scott Street Demolition

Indianapolis Motor Speedway Grandstands

Abatement and Demolition of grandstands at the historic Indianapolis Motor Speedway.

  • Location: Indianapolis, IN
  • Projected Completion: 5/16
Indianapolis Motor Speedway Grandstands

University of Tennessee—Andy Holt Housing Demolition

Demolition of 15-story student housing tower. Due to a single story building that was 30' away from the tower, extensive coordination was done to protect the structure and to ensure its safety.

University of Tennessee—Housing Demolition

Cincinnati Parking Garage Demolition

Demolished the top floor of a parking garage in downtown Cincinnati. Work involved protecting existing columns and exposing reinforcement for connection with new work.

  • Location: Cincinnati, OH
  • Completed: 2012
Cincinnati Parking Garage Demolition

Greenfield Potts Ditch Relocation

Project involved installing an 18' x 6' box culvert, sewer and water through existing streets in Greenfield, IN. Total project worth $7 million.

Greenfield Potts Ditch Relocation

Greenwood—Tower Demolition

Demolition of 8 story tower in Greenwood, IN. Project involved abatement, demolition, and site restoration.

  • Location: Greenwood, IN
  • Completed: 2013
Greenwood—Tower Demolition

Pike Township School Demolition

Demolition of 1-story school building for Pike Township School System. Concrete was crushed to provide a working surface for construction of the new building. Site grading completed after the demo.

  • Location: Indianapolis, IN
  • Completed: 2012
Pike Township School Demolition

Clarks Crossing High School Demolition

Demolition of the 3-story Clark's Crossing High School Building in Vincennes, IN. Project included demolition of a 74' tall smoke stack and a building line that was 6' away from active road. Concrete was crushed from project and used to backfill site. The site was prepared after demolition for a new park.

  • Location: Vincennes, IN
  • Completed: 2014
Pike Township School Demolition